Answer Posted / satish ramnath pekhale
Shuttering is formwork which is used to shape up footing, column, beam , slab as per there given shape and sizes. While centering is process of marking center over actual site as per drawing
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
What is Grid floor and mention its advantages ?
pls give me ans to ACT formula cube testing porpuse
Explain how you can turn off the display for dimension in CAD?
Define mirror?
why are you joining in this (applied post) job and your aim for this job
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
How to calculate the quantity of ingredients of M20 grade concrete?
What are the different approaches in designing the floors of the service reservoirs?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
to draw bm diagrams for portal frames under different loadings//
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
How we calculate the service time of buildings
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Explain what is alternate bid?