Answer Posted / satish ramnath pekhale
Shuttering is formwork which is used to shape up footing, column, beam , slab as per there given shape and sizes. While centering is process of marking center over actual site as per drawing
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
In cement concrete how to check a quality of material also proportion of material at site ?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is the water-cement ratio of mix design while 30mpa in 7 days?
what is polity
what are the duties of Site Engineer in work site?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
Will going from a 3-tap to 6-tap increase water pressure?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
What is the release of lien?
What is Heavy Concrete & Normal Concrete
What is a kip?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Explain moment of inertia and its importance.
"Gates of the dams are generally designed of curved shape". Why?