Answer Posted / ganesh bharsakle
the brick size without morter 19cm x 9cm x 9cm. total brick
is 550 nos of 1 cubik meter.
| Is This Answer Correct ? | 3 Yes | 10 No |
Post New Answer View All Answers
pls mail some more tecnical qustions at msaranya2610@gmail.com
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What do you understand by “preset” during the installation process of bridge bearings?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
what is anchorage length,lap length and (dont remember the last one)
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
States some of the commonly used commands in cad software’s?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
When column of building is abutting the boundary line,then suitable footing advised is
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the cemnent ratio