Answer Posted / vikas chauhan
Standard(Actual) size of Modular Brick = 190mm x 90mm x 90mm
Nominal(with mortar) size of Modular Brick = 200mm x 100mm x 100mm
One Cubic Meter Brick work = 1cum = 1m x 1m x 1m = 1000mm x 1000mm x 1000mm
Now if we Divide 1cum Brick Masonary work by one Brick volume then we get number of bricks in 1cum.
So number of bricks in one cubic meter "Brick Masonary Work"= 1cum/1Brick volume = 1000mm*1000mm*1000mm/200mm*100mm*100mm = 500
So number of Bricks in one cubic meter "brick masonary work" = 500 Nos.
| Is This Answer Correct ? | 31 Yes | 2 No |
Post New Answer View All Answers
What type of tensile strength is handling by crank in beam? Thanks.
how to calculate load bearing column
Please let me know what is the simplest way of Calculating Mix Designs
During reclamation how can the occurrence of mud waves can be rectified?
What are the steps involved in the concreting process?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is civil all interview questions
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.