What is the cement and sand consuption of 1:4 block work
Answer Posted / rakesh
cement part = 1/5, sand part = 4/5
now 1m3 of cement weighs 1440 kg and cube contains only 1/5part of it as cement. therefore, 1/5* 1440 kg cement present . and rest as sand..i.e. 1440*4/5kg
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How to arrive dry volume of concrete (1.52 to 1.57) ?
what is the relation between pitch of steel and depth of slab?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How to plan a project
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What are segregation and bleeding?
how to calculate weight of 1.8 cum of aggregate
Prepare a Schedule for a Highrised building from starting stage to Handover?
procedure for preliminary selection of size of column of 5 storey building
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What goals do you have in your career?
what is the effect of duration of earth quake on framed structures ?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct