Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the cement and sand consuption of 1:4 block work

Answer Posted / rakesh

cement part = 1/5, sand part = 4/5
now 1m3 of cement weighs 1440 kg and cube contains only 1/5part of it as cement. therefore, 1/5* 1440 kg cement present . and rest as sand..i.e. 1440*4/5kg

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrive dry volume of concrete (1.52 to 1.57) ?

2341


what is the relation between pitch of steel and depth of slab?

3405


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2853


How to plan a project

2290


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3478


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

2367


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2227


What are segregation and bleeding?

1185


how to calculate weight of 1.8 cum of aggregate

1721


Prepare a Schedule for a Highrised building from starting stage to Handover?

1978


procedure for preliminary selection of size of column of 5 storey building

3206


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

2378


What goals do you have in your career?

2106


what is the effect of duration of earth quake on framed structures ?

2245


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1480