Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS

Answer Posted / surjya

1)Working stress method is only available upto hooks law..i.e stress is directly proportional to strain..but in nature no matters are totally elastic in nature and does not obeys hooks law...so we introduced a new LIMIT STATE METHOD where u can design beyond the elastic limit upto plastic limit... 2)In working stress method the design is done for any structural element upto uncertain durability but in limit state the durability is limited and safe.
3)Material;time;cost of construction more in working stress....so its too much less efficient than Limt state method.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

All aptitude question of Bechtel

1932


What is soil enforcement?

1288


Define What is the distance between railway tracks?

1176


What is the likely strength of a 1:2:4 concrete mix?

1137


what is right & short method of measurement of slab&beam

2120


Slump Values for works?

2253


What is the Null Point of chimney in Power Plant

3787


how is the reinforcement is distributed in triangular slab

2276


The portion of a brick cut across the width is called?

1619


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

2237


Explain major differences between routing maintenance and major maintenance.

1157


explain the advantages of total stasion

2239


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

2313


How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

2210


sir how can we find the cement and sand required for making 4" drop

2207