which tests for concrete pouring period at the site?
Answer Posted / sjtbehera
Yes, slimp test, compaction test, cube test is after,
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate material and labor required for 100 m2 plaster?
What is different between DI Pipe and CI pipe?
How does a traffic light signal work ?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
pls give me some basic informations in construction of a structure?
What are the advantages and disadvantages of lead products in construction?
is basic cost of the material includes tax?
What is alternate bid?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
How is calculate the cube molt
how to calculate quantity of bricks in circular manhole with examples.
How to check slab shuttering level.? Or check list for slab ?
What is meaning of tlc
which type of instrument included in plumbing work?name of instrument?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.