HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX
GRADES.
Answer Posted / sjtbehera
Yes 3 nos for 7 days and 3 nos for 28days. The avg gets strength
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
How high should the water tank be to provide a 60 psi at base of this water tower?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How can i do RCC rate analysis?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
How to calculate the force on a column of three story building. What should be the base concrete height?.
what is a well
what is the criteria for the finalisation of pavement thickness in road project?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Explain soil analysis?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Doul Bar reinforcement and details of drawing.
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet