Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How big (size) can the tertiary winding be in transformer?
Can we load the tertiary winding, if yes then how much we
can load it?

Answer Posted / rabramovitz

Tyically for stabilizing an oscillating neutral, about 35%
of the KVA (or VA) supplied. Yes, it can be loaded, as long
as you don't exceed the current rating for its gage (do not
exceed current which causes a temp rise at or below the
class of the transformer). The current capability (if
properly designed)will be about a third of a primary phase
current normalized to the tertiary ratio. (call it NI/3)on
a per phase basis.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1950


i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected

2241


What is the maximum percentage voltage drop (vd%)for a motor control center

2008


Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing

1951


from which formula we select a capacitor rating?

2109


How to confirm the Phase shifting Transformer VECTOR GROUP relation , as below ZNy11.45d10.45-ZNYy0.15d11.15

3255


what is the safety of voltage power transformer(2250KVA0

1981


In Dyn11 power transformer if any one of the 3 phases connected to earth in star connected side then please explain effect of the current flow in delta connected side of transformer.(In this case if one phase is shorted to ground in star connected side then we observe the current flow in two phases only not three phases in delta connected primary side. Please explain why it is so?)

1772


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1927


WHAT IS SPEC OF CLEANROOM MOTOR AND LIGHT FITTINGS?

2311


How CFL &T5 tube light glows?

2028


send me any model test paper of clerical post of state bank of india.......

1835


what is the correct format to create a resume for interview??

1966


Is better to supply the voltage for static exciter from the auxiliary power source or from the SG terminals? And why?

1921


Work done in a free expansion process is

1156