Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which tests for concrete pouring period at the site?

Answer Posted / rajnath rajbhar

Slump test
Sample collection (Cube)
Temp.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4990


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1879


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2182


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1806


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1841


What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

2098


Different sizes of Hollow blocks and its weight. Thanks.

2412


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1764


How can we convert weight batch to volume batch for m30 mix

2991


What are the different theories of failure under static load?

1290


Describe Briefly The Various Methods Of Concrete Curing?

1097


how to absorb to site basic corrections? which are the important correction?

1469


What is Rankine Cycle?

1075


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2849


Whats the meanig of ,'K' VALUE in the case of soil.....

1987