which tests for concrete pouring period at the site?
Answer Posted / rajnath rajbhar
Slump test
Sample collection (Cube)
Temp.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to calculate the steel in 500yard
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is aggregate?
Define the various stages of the project planning process in construction.
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Explain the advantages and disadvantages of using plastic and timber fenders?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What does civil engineering mean?
What is the strength of 1:6:12 mix?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
what is idealized curve for concrere and steel
What does a construction cost covers and what does not?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)