HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX
GRADES.
Answer Posted / rajah
As per IS 7 days is not required but 7 days result is just a cross checking (7 days result must more than 77%)
for 28 days
concrete in cmt no of samples(3 cubes)
1) 1 to 5 1
2) 6 to 15 2
3) 16 to 30 3
4) 31 to 50 4
5) 51 and above 4 plus one additional sample for
each additional 50 cmt
| Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
What is the Maximum %age of Steel in columns and beams ?
Explain major differences between routing maintenance and major maintenance.
What are the steps involved in the concreting process?
Forces in a Shear Wall are in plane or out of plane ?
what are the types of design? which type of method is used at what type of design & why?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
types of laps in column
Define What is passive earth pressure ?
What is a tensile strength? What is the tensile strength of wood?
what is the function of GSB all class ?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
how to preaper for interview wat they asked in interview give me idea
can you provide a link for manual design of building?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Can we use the flyash bricks in brick bat coba?