which tests for concrete pouring period at the site?
Answer Posted / prashanth
only slump test at hte time of pouring the concrete.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
In Rcc ratio calculation I wanted to know quantity of Steel also.
Why the statue of liberty is made of copper?
How many cement sand ballast in cc 1:4:8 40mm
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is pre-stressed concrete?
What are moment of inertia and its importance in civil engineering?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
what"s the sort of beams?
What are the alternate material for steel, Sand and aggregate
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
may i know the detailed description of cutting length
What is meant by cartesian coordinate system?