Heat gain in buildings is best resisted by
Answer Posted / pranav panchal
masonary work must be done by the CLC blocks
it reduces the temperature upto 10degree celcious
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
what is civil all interview questions
What are the responsibilities of a construction manager?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Explain the latest method to detect a crack in a building?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
why we create short columns under grade slab?
what is the meaning of degreasing of the euipment or line.
Describe a time when you anticipated potential problems and developed Preventive measures
how gradation of aggregates effect on slump of fresh concrete?
what is tension & compression of steel bending.
What is the difference between routing maintenance and major maintenance in school facilities?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post: