How is Release Management is done in STLC. What are tools
can be used for the same.
Answer Posted / jayati
Here are the main elements of Release Management to have in mind:
Goals
* To plan and manage releases to the customer successfully
* To consider all technical and non-technical aspect of a release by taking a holistic view of implementing changes to IT services
Objectives
* To plan the successful roll-out of software and related hardware
* To design and implement efficient procedures for the distribution and installation of changes to IT systems
* To communicate and manage the expectations of the customer
* To ensure implementations are traceable, secure and that only correct, authorized and tested version are installed
* To agree the exact content and roll-out plan for the release, trough liaison with Change Management.
* To ensure that master copies of all software are secure and that the CMDB is updated
* To ensure that all hardware being rolled out or changed is secure and traceable, using the service of configuration management.
Release Management MindMap Picture
Inputs
* Release definition
* Release Plans, Test plans & Acceptance Criteria
* Copies of Installation media and instructions
Activities
* Release Policy and planning
* Release design, build and configuration
* Release acceptance, sign-off for implementation
* Roll out Planning
* Extensive Testing
* Communication, preparation and training
* HW and SW audit prior to Implementation of Change
* Installation of new or upgraded SW
* Storage of Controlled SW
* Release, Distribution and the Installation of SW
Release Management Activities
Outputs
* Detailed Release & Build instructions
* Purchase orders, licences & warranties for 3rd party HW and SW
* Automated installation scripts and test plans
* Master copies of install. Media and install. Instructions (stored in DSL)
* Back-out procedures
* Tested Install procedures, Release Components, backout procedures
* Known errors to be carried into live env.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is a test strategy and what does it include?
What are the various tools you have used in testing process?
When to start qa in a project?
Case Study:-Given a standard calculator with the basic functionality of addition,substration,multiplication and division-write the test case to test this and tell how did it take to write the above test case and how ling would it take to execute them?
What is the difference between web, window, desktop and client server application testing?
An automated bank teller system?
How would you prepare the test plan without srs?
What are verification and validation and difference between these two?
Explain what should your qa documents include?
Diffrence b/w compiled module and shared repository?
prepare functional requirements and design test cases for a given business requirement as follows(consider all the implicit requirements): A message portal is given,Login into that, check for any e_mail in inbox-if present reply,if not compose a mail and send it.
What the purpose of testing?
What would you do if you have a large suite to execute in very less time?
Explain stress testing, load testing and volume testing?
How do you perform integration testing?