Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we use reduction gear box to reduce turbine high rpm to 1500 rpm in small plant

Answer Posted / k.p.selvakumar.

We design the turbine rpm more than 1500 rpm ,like 5136,or 7700.because,our generator have 1500,rpm .our turbine designed having number of stages.it use for create the torque which we want.
Infact we using 1500 rpm of turbine, it cannot to able to create the desirable torque. So we using reduction gear 1500 rpm.,for high rpm turbine.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

LAPT working in alternator / generator

3637


why do you consider yourself a suitable candidate for this position

7453


procedure of how to generate power in solar plant.

1957


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3260


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1925


what is the basic use of power plant in equipment

1764


can dp type level transmitter work in under vaccum condition

1991


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2496


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2440


By any way can we increase the B check hours from 300 to 500

2207


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2294


why airtel use + 24 volts and other operators use -48 volt

2634


what's the moog valve

1516


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1751


How to calculate power press toneage

2070