What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / hany
Beam sides- 24 hrs.
Beam(spanning upto 3mtrs) bottom- 10 days
Beam(spanning more than 3mtrs) bottom- 21 days
slab (spanning upto 3mtrs)- 7 days
Slab (spanning more than 3mtr)- 14 days
rcc wall- 24 hrs
Footing- 24 hrs
Staircase soffit- 7 days
| Is This Answer Correct ? | 40 Yes | 10 No |
Post New Answer View All Answers
what is the steel difference between np-2 and np-3 pipes and weight also
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
what is the clear cover for shearwall?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
How many Sft of Level Plaster per Kg
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What is the outturn of Ceiling plastering
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Which tests are performed on soil to decide the type of foundation to be provided.
on what basis the partial factor of safety are decided? form the load combinations
Explain what is the difference between built area and super built up area?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
how many material required for brickbat water proofing of toilets.