Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if the length and breath of footing is 1.2m x 1.2 m what
will be the length and breath of foundation trench

Answer Posted / preethi

1.2+.15+.15(extent on both sides)=1.5*1.5 will be the length & breath of foundation trench

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What is made from large rocks, which protects the base of cliffs?

1130


What is the maximum strength of cub compress strength in one cub testing

1921


why demand factor less then 1 ?

2242


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2758


what is modular brick and it size

1808


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1535


How many days should curing of plastering, brick work and concrete

1722


how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????

1999


What is componsation

2275


If specific gravity of cement is less than 3.15 what is the cause?

2363


why building got air crack? if it get in one particular are what is means?

2512


Explain what are the problems one might face while having a Cantilever balcony?

1385


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2914


Explain the mechanism of cavitations in pipes and drains?

1163


brickwork labour rate per cum ?

1666