what is the actual productivity of carpentor,fitter,masson
for brickwork and masson for plaster etc
Answer Posted / n.v.ramana
1)CARPENTER=150SQFT.
2)FITTER=250KG/DAY
3)MASON=300BRICKS OR 1CUM
4)MASON-PLASTER=200SQ.FT/DAY.
| Is This Answer Correct ? | 33 Yes | 55 No |
Post New Answer View All Answers
What is the difference between built area and super built up area?
How much material will consume for following specification water tank (9*7.5*6 feet)?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
what is relation between SPT N value and driving piles after conducting a soil test?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is labor and material payment bond?
How to find out kg per Sft ?
What things you need to take care of before building a kitchen island?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
what could be the production cost of 1 cum of concrete by CP30 plant
whats is difference between anchorage length and development length
How to design staircase.plz tell me formula for the design the staircase.
What is portland cement