What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / h r mishra
Slab 7 days
Beam 10 days
wall, footings 24 hours
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
2. What are the advantages of your present job, things you like about it?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
Will water damage concrete?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
how many types of survey and what are levelling instrument?
Why you are leaving present job?
How to calculate construction cost of residential building in mumbai
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
How do you maintain water pressure?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Form where IS456 is adopted in 1978?
What is command line?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
What expenses counted in contingencies and how much it is in related to built-up area of the building.