What is the lap lenth for welded joints for reinforcement
bars. and what is its IS code no.
Answer Posted / p.k priyadarshi
16xd will be lap lenth for lower dia bar,20xd for higher
dia of bar
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the usage of zoom command?
What is the per cu. mt. price of ready mix in Gujarat region.?
how to calculate testing date
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
How to activate isometric axes in cad?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
can any one explain bar bending schedule of bems and columns and slabs ??
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Define What is aggregate?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.