Answer Posted / n3
approximately
beam,slab=60kg/m3
column,footing=80kg/m3
ie 1 to 1.5%
| Is This Answer Correct ? | 16 Yes | 17 No |
Post New Answer View All Answers
How many pyramid in egypt?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How to determine spacing of bars in slabs or beams
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What are the uses of groynes?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
How do you calculate load bearing capacity of a waffle slab?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
What things architect have to take care of before starting any project?
States some of the tool bars used in cad?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
what are the challenges of being a team leader and a supervisor?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?