Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the voltage drop of 4 Core 50 Sqmm SWA
cable for a distance of 350 mtrs and what can be the
maximum load connected to it?

Answer Posted / avd

Voltage drop in cable is a function of load current. It is
simply V=IRL. where V= voltage drop in cable, I= Load
current, R = Resistance/meter length, L= length of cable in
meters.
For maximum current carrying capacity of cable please see
menufacturers catalogue.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Starting current of a 10 HP induction Motor is ______ time’s full load current.

2869


what is the prinsiple of dc motor and construction and working ,application of dc motor.

1903


What are books to be referred for KPTCL exam?

3618


During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.

1884


A motor running with lenze frequiency inverter stops if I REDUCE SPEED with 25% load.If I run it in High speed and medium speed running smoothly with full load.please help me to solve it.

1929


wat is the first thing dat is needed, 2 lay a cable in some area??

1816


What are the main faults of DC generators?

2910


what are the difference between PLC and embedded

2087


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739


what is residuel magnetism. and how order lead acid batteries for 24 volt. emergency lighting system.

1936


What is the power requirement of tamil nadu for one month?

1977


Could Please Explain briefly. Why used stabilizing resistance series with High impedance bus differential protection relay.

1729


What is control system?

1149


WHATIS TIME CONSTANT? WHATIS ITS SIGNIFICANCE? ILLUSTRATE THROUGH EXAMLES.

2151


What is the capacity of the Fastners 12mm?

2358