1.I have a Batch job, Running for 4 hours, i want to reduce
the executing time to 2 hours what should you do?
Answer Posted / anil kumar.anumulasetty
we have to create multiple threads in the job. when we
submit the job ,multiple threads will run parallelly. so it
will take very less time to complete the job. This is the
best way I believe.
Please let me know if there are any suggestions.
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
how do I declare a table or array in rpg iv?
thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400
how can you display specific subfile page on the screen in unequal subfile?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
are there any useful c runtime apis that I can call from rpg iv?
What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?
How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...
explain sflclr, sflend, sfldlt, and sflcsrrrn?
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
What is file identifier where we can use?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?
What is ment by record level identifier?
how can I tell when to replace the array?
How to declare the pull button in AS/400..