1.How to load Records of a Physical file(PF) in the reverse
order, in CL program?
Answer Posted / anil kumar.anumulasetty
I THIS EXAMPLE I M USING EMPFILE READING IN REVERS ORDER
PGM
DCLF FILE(EMPFILE)
OVRDBF FILE(EMPFILE) SHARE(*YES)
OPNQRYF FILE(EMPFILE) KEYFLD(EMPNO *DESCEND)
READF: RCVF RCDFMT(MPILR)
MONMSG MSGID(CPF0864) EXEC(GOTO CMDLBL(END))
GOTO READF
END:
ENDPGM
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
What is a record lock error?
Explain mdt?
write an RPG program to calculate the marks of 5 students (A,B, C, D, E)in 3 different subjects (eng, math, sci) an display on the screen
how do I declare a minor?
how do I declare a table or array in rpg iv?
When it is desirable to describe files Internally?
what is a rpg?
are there any useful c runtime apis that I can call from rpg iv?
which program rpg or cl is efficent to update a transaction onto a database file and why ?
can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
how do you use commitment control in rpg?
If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?
what is the procedure and explain about real time scenario.
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.