how to design an isolated footing having load and moment
acting on the column also draw pressure diagram at the base
Answer Posted / ziyahur
my e mail id ziyacivil88@gmail.com. kindly send me
the notes Mr Nsureshbabu
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to testing voids of filled aggregate in bitumen mix design
how we calculate the vol.of wet concrete..?
What is the strongest bridge for a school contest?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
why is M30 grade Concrete use for Foothing & Column M50
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
What are the phases inspections are done by local authority while construction?
roll of DLC in road constructions
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
what course did you consider thinking before you enrolled in college?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
How much material will consume for following specification water tank (9*7.5*6 feet)?