Answer Posted / jatin
commissioning of instrument has to deal with many steps. Availability of Cable tray and trenches. Laying of cable from Instrument to Junction Boxes and then Junction Boses to Marshalling Cabinet, which are connected with DCS/PCS controller. After laying of cables termination has to be done. which can be checked with the continuity of cable. the commissioning of instrument is still pending. The loop checking has to be performed for successful commissioning.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
basic connection and principle of axial shift sensor n differential sensors in tubine describes n draw......
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.
Draw a wheatstone bridge circuit showing supply, meter and 3 wire RTD connection
what is effect of specific gravity in differential level transmitter , explain formula related with this .
Capacitance, resistance ( colour coding ), parallel & series circuits.
Why trim span ? How?
line up procedure for dp type flow transmitter?
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
which type inter lock use in petrochemical refinery,and oil & gas?
What is furnace draft control?
what is SIL 1 2 3
this site is owned by an nonsense
whats the abbreviation of IOP? is it instrument of power or input open problem?
what is exact time to study dcs and plc cources