Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40

Answer Posted / bhuwan

penetraion is 30 t0 40 mm by 25 deg tem

Is This Answer Correct ?    11 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

2322


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1612


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1533


step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

2405


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1840


what is E VALUE FOR WOOD

1999


what will be price of 1:2:4pcc per kg?

2035


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1366


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1869


How to find out slope footing concrete

2885


Explain how you can turn off the display for dimension in CAD?

1104


What are the applications of modulus of elasticity?

1287


Explain the design for rcc multi-storied building?

1076


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2023


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

6189