Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to decide Heating surface area of boiler on their steam
generating capacity?

Answer Posted / randhir singh

Heating surface area of a boiler depends on gas velocity, size of tube, tube pitch, arrangement, configuration of tube. For the same duty or heat transefer one can develop different designs with significant difference in surface area

Is This Answer Correct ?    3 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2436


what is the meaning of SST300 V56A in SIEMENS turbine

4354


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1727


why airtel use + 24 volts and other operators use -48 volt

2627


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2279


what is the basic use of power plant in equipment

1745


what is the difference between compensated & normal drum level in boiler drum?

1797


operation

1887


can dp type level transmitter work in under vaccum condition

1986


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

996


How do you consider that you can improve and what assistance do you need to achieve this

1755


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3247


procedure of how to generate power in solar plant.

1949


By any way can we increase the B check hours from 300 to 500

2189


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3402