Multiply the size of brick and get the volume ffor e.g.
4 inch brick
= 9"x3"x4"
=0.75 x 0.25 x 0.33 =0.061875 cubic foot
Now 1÷0.061875 = 16 bricks
In any kind of BRICK WORK 33% mortar is assumed in one cubiic foot
That is in 100 cubic foot 33% Will be 33 cubic foot
Consider mortar mix ratio 1:6
Therefore for cement = 33 ÷ 7 (addition of 1 and 6)
=4.71÷1.25 (1 cement bag is 1.25 cu.ft.)
=3.768 ~3.8 bags
Sand = 4.71 × 7 = 33 cu.ft
| Is This Answer Correct ? | 63 Yes | 38 No |
Post New Answer View All Answers
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is detail procedure of eccentric footing? plz. give solved exmple?
Rate analysis of Vitrified tile in cement mortor 1:3
Critical Path Method is...
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
use ofr concrete as per grade ?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is made from large rocks, which protects the base of cliffs?
What is GSB gradation
how to preaper for interview wat they asked in interview give me idea
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.