how to calculate no. of bricks for 1 cft?
how to calculate cement and sand in cft?
Answer Posted / nadim shaikh
Multiply the size of brick and get the volume ffor e.g.
4 inch brick
= 9"x3"x4"
=0.75 x 0.25 x 0.33 =0.061875 cubic foot
Now 1÷0.061875 = 16 bricks
In any kind of BRICK WORK 33% mortar is assumed in one cubiic foot
That is in 100 cubic foot 33% Will be 33 cubic foot
Consider mortar mix ratio 1:6
Therefore for cement = 33 ÷ 7 (addition of 1 and 6)
=4.71÷1.25 (1 cement bag is 1.25 cu.ft.)
=3.768 ~3.8 bags
Sand = 4.71 × 7 = 33 cu.ft
| Is This Answer Correct ? | 63 Yes | 38 No |
Post New Answer View All Answers
Why should appointment store person for project ? what is the benefits for company ?
How much cement and sand required for 9"brick wall per square metre
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
please send me bhel questions on rupesh.017@rediffmail.com
I am called for interview from north east power plant .so, I need some interview question which may help me.
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
How do You Maintain a structure after getting cube test of low strength.
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
which red: used in roof teping, then use only cement
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
How to determine thee cut length for steel reinforcement bars in R.C.C design
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Which ratio use for cement selery???
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.