Answer Posted / bilal ali khan
lap lenght is the length of bar to be overlap on other that is ld
for fe500 ld is
m40-36d
m35-40d
m30-46d
m25-49d
m20-57d
for fe415 ld is
m40-30d
m35-30d
m30-38d
m25-41d
m20-47d
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
i want texture painting pwd data
how to calculate the steel in 500yard
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is meant by scaffolding coefficient?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
what is pouring and explain
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
What is dead load impact load live load
residential projects,structural.
what are the five benefits of using standard terminology in the measurement process?
What is reinforced concrete?