how to estimate the earthwork,earth-filling for an isolated
foundation
Answer Posted / ramcharan
Earth quantity = aria isolated footing + working margin
Earth filling quantity = earth quantity _ isolated footing
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
at which depth the construction of tunnel is economical from cost and engineering aspect.
what is the max. area can we apply the plate load test ?
Civil engineering related
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
what is the productivity in aluminium shuttering per day
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is the coeffiencent Friction Angle between Steel and Ashphalt?
Questions related to civil.engg in company
WHAT DLC DESIGN IN CONSTRUCTION
What is semirigid connections?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
Define different types of roof systems?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Why should appointment store person for project ? what is the benefits for company ?