Answer Posted / nitin
bar bending schedule is nothing but the required steel which is calculated in a format like sr.no,description of item,shape,size,no of item,no of bars,cutting length,unit wt.,total wt.
Is This Answer Correct ? | 21 Yes | 5 No |
Post New Answer View All Answers
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to find out hard strata in bored pile when the DMC method adopted.
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
i need gate exam civil engineering question papers with answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
what is diversion?
whats is difference between anchorage length and development length
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Can we use the flyash bricks in brick bat coba?
how many litres of enamel paint required for 5000 sft of site??
what is BPM in concrete demolition hammers. what is better a higher value or lower
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
very simple or less time consuming formula for reinforcement calculation by moment
what is kribs is supporting?