Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why 4-20 mA signal is preferred over a 0-10V signal

Answer Posted / hari krishna

the signal are transmitted from the field to the
controlroom and vseversa through cables. for long
transmission the cable resistance increases.thus if 0-10v
are transmitted over this long distance,due to the
resistance of cable there will be drop in the voltage and
the signal received at the controlroom will not be
accurate. to overcome this difficulty 4-20ma signal is used
for transmission.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the working of rota meter.

1212


Difference between ultra sonic flow meter

1992


if in a level tx height is given, how u calculate the ranges of the tx?

7704


what is the difference between profibus and controlnet networking.

3220


what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?

1635


How to convert Differential pressure to flow in TPH

2230


how will you segregate the alarm levels in alarm management system during factory Acceptance Test

2379


What is force balance principle? State some of its’ advantages.

1168


any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com

1943


How many are the types of instrument cables in terms of No. of pair.

2187


please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2083


describe flow nozzel principle?

2513


why we use cascade control and feed foreword control in 3 element control of boiler drum ?what is feed forward and cascade control system ?

2218


Explain the burnout feature.

966


can we replace a slot sensor (inductive type) with limit switch (potenial free contact / no-nc type).

2025