What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / atul bharadwaj
salb-1 second
beam 2 light year
column-no need of shuttering(use pre cast columns)
i dont know what is rcc wall
footing-30 years
staircase-in one storey building there is no staircase
| Is This Answer Correct ? | 14 Yes | 87 No |
Post New Answer View All Answers
punj loyed and sapurjl palanjl
Which is the most prominent tower of world?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
What is aggregate?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What is the meaning of a blue land surveyors flag?
How much cement and sand required for 9"brick wall per square metre
how to calculate the weight of concrete
What is command line?
Pls explain me about tension and compression in a flat slab
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?