How can we cross check the excavation and backfilling
quantities.
Answer Posted / ajay
In case of building it will be 60%
In case of normal excavation it will be 90% without compaction
In case of compaction it will be 100%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is a tensile strength? What is the tensile strength of wood?
Which are the Steel tests ?
reinforcement slab, beam and column formulas?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
types of laps in column
Are cruise ships built for the transatlantic run?
load combinations how many types for staad design purpose?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What things you need to take care of before building a kitchen island?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
can any one explain bar bending schedule of bems and columns and slabs ??
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Why steel rods are produced only in even dimensions?
How much percentage of brick bats allowed in CD-75 bricks