How can we cross check the excavation and backfilling
quantities.
Answer Posted / ajay
In case of building it will be 60%
In case of normal excavation it will be 90% without compaction
In case of compaction it will be 100%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Which are the top apps for you civil engineer?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
crank types
sir, whitch is the best book (writer name) for prepration of gate....
Slump Values for works?
How do we test on design and style in a software?
What are your goals?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
how to find hardness of water?why it should be determined?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What are moment of inertia and its importance in civil engineering?
what is smart building materials?
Why the finite element method is lower bound solution?
how to calibrate the RM 800