Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / a.sanjeevakarna
First of all refer the contrctor agrremnt regarding the
Price escalation.
Some Govt sector accept the present rates based on the
invoices of the materials purchased and some accept only
rates approved by the govt every month.
in case of Cement and Steel in A.P. irrigation The
Escalation calculations are calculated as follows.
Cement
Date of Measeurement, Qty of concrete, Cment req as per
Design mix, Qty of Cement Consumed, Base rate + 5%,
Present rate, Present rate - Base rate, Qty of cement X
diff in price is the Escalation Amount.
Please note all above deatils sepaetared by commas are
write in Table Format.
Steel: Same as above.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the difference between linear dimension and aligned dimension?
How to testing voids of filled aggregate in bitumen mix design
what is the criteria for the finalisation of pavement thickness in road project?
What should be the standard roof height like to be?
what is total volume of ingredients used in concrete accordingly
How do you determine specific gravity of cement?
i want texture painting pwd data
what is the price of a cubic meter of concrete on international market?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is meant by residual strain?
Explain the different types of building contracts?
what is diffrence between catchment area,watershed and basin?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
How can explode a block?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?