An invisible line should intersect a visible line with
Answer Posted / suren
A)Dot B)Solid line C)dash D)no dash
| Is This Answer Correct ? | 76 Yes | 16 No |
Post New Answer View All Answers
Trapezoidal section footing calculation of Volume & its Area
a butt weld is specified by
Explain the water bound macadam roag
Why are steel plates inserted inside bearings in elastomeric bearing?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Time required for curing of wall tiles before fixing
What is a hatch patterns?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
sir, whitch is the best book (writer name) for prepration of gate....
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
types of survey and levelling instrument ?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
Why should you show Client/Engineer activities clearly on the project plan?