How du we calculate dry cement (in Bags) for any concrete,
also sand and aggregate? How many bags of cement does 100
cft of concrete 1:2:4 require? Procedure to calculate the
required amount. Also if there is any easy thumb rule to
find out.
Answer Posted / muhammad younas
100*1.54=154 (1.54 for wet to dry)
1+2+4=7 (sum of ratio)
formula:
cement : (154*1)/7=22 cft = 22/1.25=17.60 Bags
sand : (154*2)/7=44 cft
aggregate: (154*4)/7=88 cft
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
Explain major differences between routing maintenance and major maintenance.
how many kg of 20mm, 10mm, dust available in one ton stone boulder
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
why do we provide haunches in rcc box or underpasses?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What is an ortho mode?
What is construction mitigation management?
Why are steel plates inserted inside bearings in elastomeric bearing?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How much cement and water required for cement selery????
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?