Respected Sir,
I am from a hilly place called Darjeeling ,I have
constructed house of 9 column out of which 4 of the column
is under water , i have put rcc slab on top and on top of
the rcc slab i have construced two room house with bricks
and light roof , now i am planning to change the light roof
with rcc slab for the two room, my main concern is will the
column under water will hold the load of the new rcc slab
coz it already 10 to 12 yrs old , i dont know what to do ,
can u advice me regarding this matter, weather to leave the
upper floor roof light or make it rcc slab.(If i put the
slab , it will require 45bags of cement and u calculate how
much of steel and sand and pebbles)
thanks
with regard
Anand
Answer Posted / sudin shaha
sir,
you must consult your r.c.c consultant for by what factor of
safety they have considered and for how many storied bldg.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is Architect-Prepared Contract?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
In the roof of a pumping station explain briefly the components of a waterproofing system?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What are the important hardware systems used for cad?
What are the uses of groynes?
What is command line?
how to do sudoko puzaals?
important question on stones
How do you maintain water pressure?
What is the snap size in civil and how can we create it?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!