Answer Posted / sudin shaha
plum concrete is usually done where the surface is uneven and to minimise the costing of concrete.for eg. below footings of residencial bldgs where in a small portion where the slope of ground below single footing is 1:10 to 1:50 in that case to save the cost of concrete plum is usually preffered.This finally leads to minimise the construction cost of building in all.
| Is This Answer Correct ? | 58 Yes | 8 No |
Post New Answer View All Answers
What is difference between engineering stress and true stress?
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is the exception critarea of cube?
What are the applications of modulus of elasticity?
What is braced excavation all about?
What is meaning of FREE STANDING STAIRCASE ?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
what are the ffactors you considered choosing the course?
How much does the leaning tower of pisa lean?
what is cross hair cursor?
Which architectural movement is also known as jazz moderna?
What is kn measurement?
Time required for curing of wall tiles before fixing
what is right & short method of measurement of slab&beam
How are freeway bridges built?