if the length and breath of footing is 1.2m x 1.2 m what
will be the length and breath of foundation trench
Answer Posted / jt
1.2+extra width for pcc(.15) =1.35 wide and 1.35 length may
be sufficint for excavation bottom.
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
115mm thickness brick work how to required mortar
What is the difference between EPC,DBOOT and BOOT.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What is different between DI Pipe and CI pipe?
what is idealized curve for concrere and steel
how we can find sieve #4 is 4.75mm?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.