Should vertical shuttering done for CC/ RCC for Damp Proof
Course (DPC) be measured?
Answer Posted / anupom
Above answer is right, also
THe thickness of DPC is very less(apprx. 25mm) and is
generally applied as a coating layer for plinth level. Thus
the vertical shuttering may not be measured but this solely
depends on the contract specification.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
load combinations how many types for staad design purpose?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what does the track parameter mean in staad.pro?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is command line?
what is the dimensions of river sand truck trailer or trolly ?
How many % we consider for lap for reinforcement for estimates
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
3. What are the disadvantages of your present job, things you do not like about it?
how we can find sieve #4 is 4.75mm?
how we calculate the vol.of wet concrete..?
what isload waring calculation
What are the disadvantages while using stone dust as filler in pavements?
Why we provide hair pin for shed
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.