why we use tapechanger in primary side of transformer
Answer Posted / bhabanipattanayak
In a transformer pri. Wdg. Is
always wound over sec. Wdg.
So it is not possible to
connect tap changer in sec.
Side. For this reason we use
tap changer in pri. Side.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
how do you choose the cable size as per amps rating & the voltage drop for the same.
How Diesel Generator start ?
what is frequency response?
will there be any problem by recovering slip from single phase induction motors?
could you measure current in parallel?
what is protection class current transformer.
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
How we can defined theecopper cable size if we know the aluminium cable size?
how to calculate the settings for shaft ct protn in hydro generators
HOW WE KNOW IN PHYSICALLY THE CONTACT SURFACE OF A VACUUM INTERRUPTER IS GOOD OR GOING TO DAMAGE IN A VCB AFTER ABOVE 500 TIMES OPERATED.
how to select the automotive wire size by mathematical calculation. for xenon headlamp with ballast. the ballast given data voltage 10-17v,current permenant 6amp, run up phase is 15amp, peak at swicth on max 400micro sec is 40amp.the sum of cable resistance is 150mohm.please provide referenc document if any for relating the peak at switch on current,time & wire wire size
What range of speed can you get with the armature control method of speed control of d.c. Shunt motor?
As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.
what is the power factor used by the PHCN in nigeria? 2. what is the difference between an alternator and generator. 3. Generation of poweris in KV but how is transmission is in MW. 4.If the transmission of power is 20,000MW how can it be increaesed to 80,000MW
what is method for testing CT