Is it possible to convert 4 wire transmitter to convert to
2 wire with additional relay.Please send detial with
drawing,i will appreciate.
Answer Posted / amit
it's function ablavale in transmitter otherwise we do not
convert them.
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
What is the minimum rating availalbe for weld neck orifice in market?
If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?
components of control circuit belongs to control valve
what is sil (safety integrity level
i want to find out iffco get test paper
Explain signal isolator
what are the use of belew gear in general ??
How to Calibrate Ultrasonic flow Transmitter in Field
With N nodes and B branches what will have a network ???
How to Calibrate Level Switch in field
I need to know steps to Calibration Valve Guard......
What is difference between differential pressure & delta pressure?
Capacitance, resistance ( colour coding ), parallel & series circuits.
What is motion balance principle?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.