What are the tests carried out on transformer while testing
at sites?..Pls explain me in detail
Answer Posted / sadineni sreedhar
we are carried out the below tests
1)IR-insulation resistance
2)turns ratio test
3)winding resistance test
4)automatic capacitance and tan delta or dissipation test
5)short circuit and open circuit test
6)vector group test
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the BS(British Standard)code for 11kv motor
defination of controlled shunt reactor
What are the types of class b amplifier?
What is effect of harmonic current (Draw by VFD) on power system/ electrical Equipments ?
why ht motors are star connected?
What are the applications of the electric motors?
i have install 750 kva distribution transformer at my site and want to do neutral earthing. what calculations should i follow to determine earthing conductor material and size?
An active element is one which a. Supplies energy b. Absorbs energy c. Supplies energy and convert energy from one form to another
Why arc quenching is used in Diode ?
Can anybody just suggest about the scope of Electrical design with ETAP software?Just guide me?
Connection diagram for KW meter and Kva meter
we have 3 single phase transformers. how will we generate 6 supply from 3 phase supply input
Draw a block diagramof Three UPS systems connected in Parallel mode?
Grid fault level [KA]?
Explain how you intend to work under pressure to meet up with deadline target?