Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Method of findingthe dry ingredient quantity of 1 m3
concrete.

Answer Posted / waqar

you r confusing mr. some where u r using 1.52 constant and some where u r using 1.54. why you r confusing when 1.54 is correct?

Is This Answer Correct ?    27 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we can use dust in concrete insted of fly ash

2068


Formula of mid span bar

1878


How to determine spacing of bars in slabs or beams

2408


What are the applications of the modulus of elasticity?

1037


what is the difference between np2 and np3 concrete mix

2002


what is project?

2334


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2575


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

2707


residential buildings,mixing of concrete,structural,construction material,site handling.

2422


What is the procedure of concealed plumbing in toilets?

2290


what is diffrence between catchment area,watershed and basin?

2917


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1865


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2098


Why should you show Client/Engineer activities clearly on the project plan?

2362


Explain what is structural frames or systems?

1094