any deviation can be changed into the change control?
Answer Posted / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Post New Answer View All Answers
What is your work experience in pharmaceutical field?
what is difference between uniformity of content and content uniformity as official test for tablet
define the starting material?
what is difference between usfda and mhra guidline
plz if anyone have a model question papers for exam of drug inspector than plz send me on my E-mail ID hitesh_hirpara2000@yahoo.com
What is the difference between Analytical method validation and Analytical method transfer?
How to check the integrity of Sieve, Screen, FBD Bag?
What are the limits for LOD and LOQ?
i've completed B.Pharmacy in nov.2009 & now i want to apply for drug inspector,but i don't know about the eligibility ,procedure to apply ,entrance test,interviews,etc. so i want a detailed information about it.please send me the information.thanks
How we fix the validity period of a volumetric solution and re-standardization due date?
when will andhara pradesh government announces drug inspector posts and when will be the exam conducted? please inform me..
What is the relative response factor in related substances?
how you can fix the known and unknown impurity limit for any drug substance
the international interview procedure for a job.
Describe how you would educate a patient about the proper use of Alprazolam, including dosing instructions, potential side effects, and the importance of follow-up appointments.