any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
| Is This Answer Correct ? | 10 Yes | 2 No |
What is stationary phase?
What should be the minimum limit of a working standard?
what is difference between polarimeter lamp and IR lamp
What is the difference between Analytical method validation and Analytical method transfer?
Why do not dry vanillin befour MR CALIBRATION
Why and When RRF is necessary in RS method? How it is helpful in method development?
0 Answers Hetero, Panacea, Raks Pharma,
What skills would you look for while hiring a pharmaceutical representative?
Why we said Glacial Acetic Acid to Acetic Acid m
How would you propose to advertise your drug?
How related substance method is developed for new compound which is not official in the pharmacopeia?
i have finished my B. Pharm ,i want to join Pharmacy concil of india, what to do, please suggest me , how to make carrier best in this field, donot wanna go for M. Pharma. please help me.
what is recovery factor