any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
Is This Answer Correct ? | 10 Yes | 2 No |
What is the difference between Analytical method validation and Analytical method transfer?
What are closely monitor parameters in stability study?
what do you mean by end capping
How we fix the validity period of a Normal solution and re-standardization due date
What is the formula for KF standardization?
why should we not dispatch the reprocess material to export
why some samples are taking 500mg for water content and some samples are taken 2g for water content?
What do you mean by CAPA?
how quantitative stability studies are done?
what should be minimum limit of working standard
If calibration of 12 bowl dissolution apparatus does not meets single stage procedure, how can you precede calibration?
In Stability testing if significant change occurs then what will be the action plan