any deviation can be changed into the change control?

Answers were Sorted based on User's Feedback



any deviation can be changed into the change control?..

Answer / kishor solanke (alkem)

Only planned deviiations are changed into change controls.

Is This Answer Correct ?    42 Yes 4 No

any deviation can be changed into the change control?..

Answer / rajeswari

when planed deviation is implemented for quality management system then change controls can be raised

Is This Answer Correct ?    25 Yes 3 No

any deviation can be changed into the change control?..

Answer / mohinder singh

concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control

Is This Answer Correct ?    20 Yes 0 No

any deviation can be changed into the change control?..

Answer / deepthi

Yes few deviations can be changedto changecontrol.

Is This Answer Correct ?    10 Yes 2 No

Post New Answer

More Pharmacy Interview Questions

What is the difference between Analytical method validation and Analytical method transfer?

0 Answers  


What are closely monitor parameters in stability study?

2 Answers  


what do you mean by end capping

1 Answers  


How we fix the validity period of a Normal solution and re-standardization due date

2 Answers  


What is the formula for KF standardization?

2 Answers  






why should we not dispatch the reprocess material to export

1 Answers   Ranbaxy,


why some samples are taking 500mg for water content and some samples are taken 2g for water content?

1 Answers   Natco,


What do you mean by CAPA?

2 Answers  


how quantitative stability studies are done?

0 Answers  


what should be minimum limit of working standard

1 Answers  


If calibration of 12 bowl dissolution apparatus does not meets single stage procedure, how can you precede calibration?

0 Answers  


In Stability testing if significant change occurs then what will be the action plan

2 Answers  


Categories