any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
| Is This Answer Correct ? | 10 Yes | 2 No |
How related substance method is developed for new compound which is not official in the pharmacopeia?
i am a final year student pursuing B PHARMACY. i want to be a drug inspector. so plz tell how can i step forward toward this. plz tell me what should i do
What do you mean by MKT (Mean Kinetic Temperature) in stability?
In Stability testing if significant change occurs then what will be the action plan?
What is limit of cleaning validation?
what is manual integration in HPLC
3 Answers Hetero, Jubilant, Lupin,
can anyone help me by sending me model papers regarding drug inspector exam entrance model papers if yes plz send me to my email if yes sravani_262000yahoo.com, sravs.potti@gmail.com
What are the stability zones and stability conditions?
Why we use potassium hydrogen pthalate for determination of calibration in Total organic carbon
0 Answers Nectar Lifesciences,
what is limit of cleaning validation
How polarimeter is calibrated?
what is difference between method validation and method verification