any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
| Is This Answer Correct ? | 10 Yes | 2 No |
how to convert potency from on anhydrous basis to on dried basis?
disintigration time of coated tablets
21 Answers Globe, Nem Laboratories, Ranbaxy,
What is the disintegration time for Hard Gelatin Capsule?
the international interview procedure for a job.
What do you mean by MACO?
what is the calculation for getting the tablet weight and the punch size, Eg..if there is a 8/32 punch then how to measure tablet weight????
Whhat is the justification for stability study in api missed stations through deviations and statistical analysis is required.
which is best Training Institute for Clinical Data Management,sdtm,sas ?
how the qualification of pharma can help in banking
0 Answers Banking, Reddy Labs,
How LOD & LOQ calculating?
What is the storage condition for reference standard?
WHEN WILL GUJRAT GOVERNMENT ANNOUNCES DRUG INSPECTOR POSTS AND WHEN WILL BE THE EXAM CONDUCTED? INFORM ME AND ALSO EAMINATION DATE