How we calculate the cement for the M 15 normal concrete with
aggregate size is 40 mm ?
Answer Posted / hari
for M15 proportion is 1:2:4
dry volume of concrete in 1 cum = 1.54
cement qty - 1.54/(1+2+4)*1 = 0.22cum
Fine Agg - 1.54/(1+2+4)*2 = 0.44cum
coarse Agg - 1.54/(1+2+4)*4 = 0.88 cum
check any proportion - (0.22+0.44+0.88) = 1.54cum
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
five benefits of using standard terminology in the measurement process
crank types
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is type failure of road surface? how to repair the failure of road surface?
Which is the direction of negative angle?
pls tell me about method of cutting length of ties column
How do we test on design and style in a software?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
acceptance criteria for concrete works
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what is the difference between natural draught cooling tower and induced draught cooling tower
How long does it take concrete to harden?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.