one MT of steel for using how much binding wire required?
Answer Posted / neel
8 kg / MT
| Is This Answer Correct ? | 19 Yes | 3 No |
Post New Answer View All Answers
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Define What is the tensile strength of wood?
what is the anchorage length of reinforcement.
what is detail procedure of eccentric footing? plz. give solved exmple?
what is meant by shear center?????
What is Refuse Area In High Rise Building ?
what is modular brick and it size
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
How do you convert wind speed into force?
how to calculate the density for high density concrete ? or is it same as the density of RC?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
For what purpose bedding is used under storm water drains?
can you provide a link for manual design of building?
How can we demolish concrete beams?