How we calculate the cement for the M 15 normal concrete with
aggregate size is 40 mm ?
Answer Posted / raju
for M15 proportion is 1:3:6
assume wet volume 1 m3 of work
to produce 1 m3 of wet volume we need 1.54 dry volume
cement qty=1.54/1+2+4=0.22 m3
hence no of bag=0.22*1440/50=6.33 nos
sand qty=0.154*2=0.308 m3
agg qty=0.154*4= 0.616 m3
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
how do you stabilize a waterlogged area in road construction
What is proportion of PCC Grade G?
how many litres of enamel paint required for 5000 sft of site??
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What in your past experience or education prepares you for the position for which you are applying
what is parametre for M25 after 7 days strength
For a washout valve why are two gate valves required in normal practice?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
What is difference between combin footing & rapt footing
dialation means
Which tests are performed on soil to decide the type of foundation to be provided.